Personal tools
You are here: Home Class Information R Class Construction L3 hull Out of mould, hull with wings
Document Actions

Out of mould, hull with wings

Almost finished. The hull has been popped out of the mould and just needs the tank seams finished, centrecase sides, some tidying up and painting.

Nuplex Industries Limited Logo At last the hull is out of the mould, the centreline join looks pretty even and there's no damage to the mould or hull. The chines are pretty close to perfect.

Amy makes lifting the L3 overhead look pretty easy, while Dan and Sean look on.
Amy lifting the L3

It was great to see Reilly and Mitch Dean and Paula England who all came down to check out the hull. Shame they wouldn't stand in the photo.Hull with wings view from bow

Hull with wings view from transom

Checking against the 28kg estimate.
Total weight - Dan = 29kgs, not bad.
Total weight - Dan = 29kgs

Leander 2008 Gold Sponsor
Pub Charity
Leander 2008 Silver Sponsor
Brent Cowan Plumbers
Navigation
Leander 2008 Bronze Sponsors
ASB Bank Limited Ian Franklin Boat Builders Ltd International Rope Braids Pty Lyttelton Port Company Limited Eastgate and South City Muffin Break Ocean Blue Marine PJ Hobbs Industries Ltd Wairakei Road Subway TheVirtual Limited
Leander 2008 Auckland Squadron Transport
Pacifica Shipping